Documents Directory

You can filter the results to show only the items that match your interest.

Documents Published By Stage

Acceptance (16)
Acceptance letter (1)
Adequacy of Consultation (12)
Other Documents (2)
Procedural Decisions (1)
Decision (13)
Correction Order (1)
Development Consent Order as made (1)
Habitats Regulations Assessment (1)
Notification of Decision to Accept Application (1)
Other Documents (1)
Recommendation Report (1)
Secretary of State Consultation (6)
Secretary of State letter and Statement of Reasons (approved) (1)
Developer's Application (128)
Application Form (4)
Compulsory Acquisition Information (3)
Draft Development Consent Orders (3)
Environmental Statement (92)
Other Documents (1)
Plans (14)
Reports (11)
Examination (173)
Accompanied Site Inspection (2)
Additional Submissions (5)
Compulsory acquisition hearing (if requested) (1)
Deadline 1 (14)
Deadline 2 (41)
Deadline 3 (28)
Deadline 4 (9)
Deadline 5 (12)
Deadline 6 (8)
Deadline 7 (7)
Deadline 8 (9)
Deadline 9 (16)
Draft Development Consent Orders (1)
Examination Library (1)
Hearing Agendas (1)
Issue Specific Hearing on draft DCO (1)
Issue Specific Hearing on Environmental Matters (4)
Notification regarding close of examination (s99) (1)
Preliminary Meeting Note (1)
Procedural Decisions (8)
Recording of Preliminary Meeting (1)
Report on the Implications for European Sites (RIES) (1)
Unaccompanied Site Inspection (1)
Pre Application (6)
Environmental Impact Assessment (2)
Other Documents (2)
Scoping opinion (Rule 8 EIA Regs) (2)
Pre Examination (6)
Certificate of s59 notification (59) (1)
Procedural Decisions (2)
s56 notification (s56) (3)
Showing All Documents (342 results)
Filter results
Showing 1 to x of x entries (filtered from 342 total entries)

Description

Department for Business, Energy and Industrial Strategy (PDF, 81.58 KB)

Correction Order - December 2018

Decision > Correction Order Published: 07/12/2018

Development Consent Order as Made by the Secretary of State (PDF, 467.49 KB)

Decision > Development Consent Order as made Published: 20/09/2018

Habitats Regulations Assessment (PDF, 2.94 MB)

Decision > Habitats Regulations Assessment Published: 20/09/2018

Post-examination Submissions (PDF, 564.05 KB)

Decision > Other Documents Published: 20/09/2018

Regulation 23 Notice – Notification of Decision Letter (PDF, 159.18 KB)

Decision > Notification of Decision to Accept Application Published: 20/09/2018

Secretary of State Decision Letter (PDF, 315.20 KB)

Decision > Secretary of State letter and Statement of Reasons (approved) Published: 20/09/2018

The Crown Estate (PDF, 100.98 KB)

Response to the Department of Business, Energy and Industrial Strategy request for further comments on 1 August 2018

Decision > Secretary of State Consultation Published: 21/08/2018

Dalton Warner Davis on behalf of Eggborough Power Limited (PDF, 223.79 KB)

Response to the Crown Estate's Letter dated 20 August 2018

Decision > Secretary of State Consultation Published: 21/08/2018

Secretary of State Consultation (PDF, 78.74 KB)

Letter from the Secretary of State dated 1 August 2018

Decision > Secretary of State Consultation Published: 01/08/2018

Dalton Warner Davis (PDF, 111.64 KB)

Response to the Department of Business, Energy and Industrial Strategy request for information on 9 July 2018

Decision > Secretary of State Consultation Published: 24/07/2018

The Crown Estate (PDF, 752.52 KB)

Response to the Department of Business, Energy and Industrial Strategy request for information on 9 July 2018

Decision > Secretary of State Consultation Published: 24/07/2018

Department for Business, Energy & Industrial Strategy (PDF, 86.56 KB)

Letter from the Secretary of State - 9th July 2018

Decision > Secretary of State Consultation Published: 09/07/2018

Notifcation of Completion of the Examining Authority’s Examination (PDF, 97.86 KB)

Section 99 Notification of Completion of ExA Examination

Examination > Notification regarding close of examination (s99) Published: 28/03/2018

Eggborough Power Limited (PDF, 367.58 KB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority - Application Guide - Rev.10.0 (End of Examination Version)

Examination > Deadline 9 Published: 27/03/2018

Canal and River Trust (PDF, 510.66 KB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority

Examination > Deadline 9 Published: 26/03/2018

Eggborough Power Limited (PDF, 1.50 MB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority

Examination > Deadline 9 Published: 23/03/2018

Eggborough Power Limited (PDF, 2.24 MB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority

Examination > Deadline 9 Published: 23/03/2018

Eggborough Power Limited (PDF, 803.17 KB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority

Examination > Deadline 9 Published: 23/03/2018

Eggborough Power Limited (PDF, 418.76 KB)

Late Submission for Deadline 9 accepted at the discretion of the Examining Authority

Examination > Deadline 9 Published: 23/03/2018

Eggborough Power Limited (PDF, 998.66 KB)

9.13 Section 106 Planning Agreement with Selby District Council - Demolition of coal station - Rev. 2.0 (Final Version)

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 731.24 KB)

7.1 Statement of Common Ground (SoCG) with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 5.0

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 33.42 KB)

9.9 Compulsory Acquisition Update

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 268.68 KB)

1.2 Application Guide (Rev. 9.0)

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 404.01 KB)

Planning Performance Agreement with Selby District Council - Discharge of requirements - Rev. 1.0 (Final Version)

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 791.45 KB)

2.14 Draft DCO - Comparison to Deadline 8 Version

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 233.75 KB)

7.9 Statement of Common Ground (SoCG) with National Grid Gas Plc (NGG) and National Grid Electricity Transmission Plc (NGET) - Rev. 3.0

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 5.56 MB)

9.8 Section 106 Planning Agreement with Selby District Council and Yorkshire Wildlife Trust - Biodiversity enhancement - Rev. 3.0 (Final Version)

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 1.50 MB)

2.1 Draft Development Consent Order (DCO) - Rev. 7.0

Examination > Deadline 9 Published: 15/03/2018

Eggborough Power Limited (PDF, 109.71 KB)

Covering Letter

Examination > Deadline 9 Published: 15/03/2018

Shakespeare Martineau on behalf of National Grid Plc (PDF, 822.70 KB)

Examination > Additional Submissions Published: 13/03/2018

Marine Management Organisation (MMO) (PDF, 202.26 KB)

Submission for Deadline 8

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 1.03 MB)

7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 1.07 MB)

2.1 Draft Development Consent Order (DCO) - Rev. 6.0

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 835.99 KB)

2.12 Draft DCO - Comparison against Deadline 6 Version

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 538.27 KB)

2.13 Explanatory Note on Changes to Draft DCO

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 11.76 MB)

5.10 Indicative Landscape and Biodiversity Strategy (Rev. 2.0)

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 489.68 KB)

1.2 Application Guide (Rev. 8.0)

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 109.87 KB)

Covering Letter

Examination > Deadline 8 Published: 01/03/2018

Eggborough Power Limited (PDF, 2.63 MB)

7.11 Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust

Examination > Deadline 8 Published: 01/03/2018

Examining Authority’s Draft Development Consent Order (DCO) issued on 19 February 2018 (PDF, 234.79 KB)

Examining Authority's Draft Development Consent Order (DCO) issued on 19 February 2018

Examination > Draft Development Consent Orders Published: 19/02/2018

Natural England (PDF, 3.19 MB)

Submission for Deadline 7

Examination > Deadline 7 Published: 15/02/2018

Marine Management Organisation (MMO) (PDF, 215.10 KB)

Submission for Deadline 7

Examination > Deadline 7 Published: 15/02/2018

Eggborough Power Limited (PDF, 1.15 MB)

7.10 Statement of Common Ground with the Marine Management Organisation (MMO) - Rev. 4.0

Examination > Deadline 7 Published: 15/02/2018

Eggborough Power Limited (PDF, 530.93 KB)

4.14 Indicative Deemed Marine Licence Coordinates Plans (Rev. 3.0)

Examination > Deadline 7 Published: 15/02/2018

Eggborough Power Limited (PDF, 220.75 KB)

9.15 Comments on Report on Implications for European Sites (RIES)

Examination > Deadline 7 Published: 15/02/2018

Eggborough Power Limited (PDF, 561.26 KB)

7.1 Statement of Common Ground with North Yorkshire County Council (NYCC) and Selby District Council (SDC) - Rev. 4

Examination > Deadline 7 Published: 15/02/2018

Eggborough Power Limited (PDF, 246.87 KB)

1.2 Application Guide (Rev. 7.0)

Examination > Deadline 7 Published: 15/02/2018

Wardhadaway on behalf of Canal and River Trust (PDF, 2.37 MB)

Submission for Deadline 6

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 1.22 MB)

2.1 Updated Draft Development Consent Order (DCO) - Rev. 5.0

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 345.88 KB)

Covering Letter

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 6.02 MB)

4.2 Updated Land Plans (Rev.3.0)

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 299.44 KB)

2.11 Explanatory Note on Changes to Draft Development Consent Order (DCO)

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 869.07 KB)

2.10 Draft Development Consent Order (DCO) - Comparison to Deadline 5 Version

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 487.78 KB)

1.2 Application Guide (Rev.6.0)

Examination > Deadline 6 Published: 01/02/2018

Eggborough Power Limited (PDF, 251.66 KB)

7.11 Updated Draft Statement of Common Ground (SoCG) with the Yorkshire Wildlife Trust (Rev.3.0)

Examination > Deadline 6 Published: 01/02/2018

Report on the Implications for European Sites (RIES) (PDF, 493.90 KB)

Issued by the Examining Authority - 25 January 2018

Examination > Report on the Implications for European Sites (RIES) Published: 25/01/2018

Request for Further Information – Rule 17 (PDF, 76.53 KB)

Examination > Procedural Decisions Published: 25/01/2018

Eggborough Power Limited (PDF, 864.45 KB)

Deadline 5 Submission - 2.8 Draft DCO – Comparison to Deadline 3 Version

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 326.04 KB)

Deadline 5 Submission - 2.9 Explanatory Note on Changes to Draft DCO

Examination > Deadline 5 Published: 10/01/2018

North Yorkshire County Council (PDF, 107.42 KB)

Deadline 5 Submission - Letter to PINS

Examination > Deadline 5 Published: 10/01/2018

North Yorkshire County Council and Selby District Council (PDF, 295.47 KB)

Deadline 5 Submission - Response to ExA Written Questions

Examination > Deadline 5 Published: 10/01/2018

The Environment Agency (PDF, 38.52 KB)

Deadline 5 Submission - Response to ExA Written Questions

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 3.27 MB)

Deadline 5 Submission - 9.12 Response to the ExA’s Request for Further Information on Habitats Regulations Assessment (including Appendix 1)

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 346.45 KB)

Deadline 5 Submission - 9.11 Applicant’s Responses to the Examining Authority’s (‘ExA’s’) Further Written Questions

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 171.57 KB)

Deadline 5 Submission - 9.14 Correction to Applicant’s Response to Deadline 3 Submissions

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 959.43 KB)

Deadline 5 Submission - 9.13 Draft Section 106 Planning Agreement with Selby District Council – Demolition of the existing coal-fired power station

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 6.84 MB)

Deadline 5 Submission - Cover Email

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 1.29 MB)

Deadline 5 Submission - 2.1 Updated Draft DCO (Rev. 4.0)

Examination > Deadline 5 Published: 10/01/2018

Eggborough Power Limited (PDF, 267.47 KB)

Deadline 5 Submission - 1.2 Application Guide (Rev. 5.0)

Examination > Deadline 5 Published: 10/01/2018

North Yorkshire County Council (PDF, 60.99 KB)

Deadline 4 Submission

Examination > Deadline 4 Published: 22/12/2017

Marine Management Organisation (PDF, 216.73 KB)

Submission for Deadline 4 and 5

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 351.34 KB)

Deadline 4 Submission - 7.9 Statement of Common Ground with National Grid Gas Plc & National Grid Electricity Transmission Plc (Rev. 2.0)

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 262.20 KB)

Deadline 4 Submission - 1.2 Application Guide (Rev. 4.0)

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 3.07 MB)

Deadline 4 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust (Rev. 2.0)

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 1,009.25 KB)

Deadline 4 Submission - 7.10 Statement of Common Ground with the Marine Management Organisation (Rev. 3.0)

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 33.42 KB)

Deadline 4 Submission - 9.9 Compulsory Acquisition Update (Rev. 1.0)

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 4.89 MB)

Deadline 4 Submission - Covering Email

Examination > Deadline 4 Published: 22/12/2017

Eggborough Power Limited (PDF, 321.11 KB)

Deadline 4 Submission - 9.10 Applicant’s Response to Deadline 3 Submissions (Rev. 1.0)

Examination > Deadline 4 Published: 22/12/2017

Further Written Questions (PDF, 91.79 KB)

Further Written Questions

Examination > Procedural Decisions Published: 14/12/2017

Hensall Parish Council (PDF, 14.66 KB)

Late Deadline 3 Submission - Accepted at the discretion of the Examining Authority

Examination > Deadline 3 Published: 11/12/2017

Rule 8(3) and Rule 17 Letter (PDF, 142.98 KB)

Examination > Procedural Decisions Published: 05/12/2017

Eggborough Power Limited (PDF, 11.28 MB)

Deadline 3 Submission - Covering Email

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 478.93 KB)

Deadline 3 Submission - 7.1 Updated Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 3.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 244.60 KB)

Deadline 3 Submission - 9.6 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Compulsory Acquisition on 23 November 2017

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 307.05 KB)

Deadline 3 Submission - 2.7 Explanatory Note on Changes to Draft DCO (Deadline 3) (Rev. 1.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 341.06 KB)

Deadline 3 Submission - 7.11 Updated Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 2.0)

Examination > Deadline 3 Published: 01/12/2017

Marine Management Organisation (PDF, 213.84 KB)

Deadline 3 Submission - MMO Response to Deadline 3

Examination > Deadline 3 Published: 01/12/2017

National Grid (PDF, 25.80 KB)

Deadline 3 Submission - Letter from National Grid

Examination > Deadline 3 Published: 01/12/2017

North Yorkshire County Council and Selby District Council (PDF, 53.56 KB)

Deadline 3 Submission - Letter to ExA

Examination > Deadline 3 Published: 01/12/2017

Yorkshire Wildlife Trust (PDF, 4.17 MB)

Deadline 3 Submission - Response to ExA's Written Questions

Examination > Deadline 3 Published: 01/12/2017

Yorkshire Wildlife Trust (PDF, 1.95 MB)

Deadline 3 Submission - Wet Woodland Creation Map Lower Aire

Examination > Deadline 3 Published: 01/12/2017

Yorkshire Wildlife Trust (PDF, 1.94 MB)

Deadline 3 Submission - Working with Natural Processes- Using the Evidence Base

Examination > Deadline 3 Published: 01/12/2017

Yorkshire Wildlife Trust (PDF, 371.01 KB)

Deadline 3 Submission - Project Summary - Working with Natural Processes

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 528.56 KB)

Deadline 3 Submission - 9.3 Applicant’s Comments on the Local Impact report, Written Representations and Responses to the ExA’s First Written Questions

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 1.23 MB)

Deadline 3 Submission - 7.3 Statement of Common Ground with the Environment Agency (Rev. 3.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 470.28 KB)

Deadline 3 Submission - 9.4 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on Environmental Matters held on 22 November 2017

Examination > Deadline 3 Published: 01/12/2017

Canal and River Trust (PDF, 47.47 KB)

Deadline 3 Submission - Protective Provisions

Examination > Deadline 3 Published: 01/12/2017

Canal and River Trust (PDF, 639.91 KB)

Deadline 3 Submission - Code of Practice Part 1

Examination > Deadline 3 Published: 01/12/2017

Canal and River Trust (PDF, 818.85 KB)

Deadline 3 Submission - Code of Practice Part 2

Examination > Deadline 3 Published: 01/12/2017

Canal and River Trust (PDF, 913.34 KB)

Deadline 3 Submission - Covering Letter

Examination > Deadline 3 Published: 01/12/2017

Canal and River Trust (PDF, 817.46 KB)

Deadline 3 Submission - Code of Practice Part 3

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 860.80 KB)

Deadline 3 Submission - 2.6 Draft DCO Comparison to Deadline 2 Version (Rev. 1.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 48.56 KB)

Deadline 3 Submission - 9.6 Appendix 1

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 263.06 KB)

Deadline 3 Submission - 1.2 Application Guide (Rev. 3.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 5.80 MB)

Deadline 3 Submission - 9.7 Demolition of the Existing Coal-Fired Power Station, including Appendices 1 and 2

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 314.27 KB)

Deadline 3 Submission - 9.5 Written Summary of Applicant’s Oral Case put at the Issue Specific Hearing on the Draft DCO held on 23 November 2017

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 1.27 MB)

Deadline 3 Submission - 2.1 Updated Draft DCO (Rev. 3.0)

Examination > Deadline 3 Published: 01/12/2017

Eggborough Power Limited (PDF, 331.00 KB)

Deadline 3 Submission - 9.8 Draft Section 106 Agreement with Selby District Council and the Yorkshire Wildlife Trust

Examination > Deadline 3 Published: 01/12/2017

Response to Mr R Tams to a request to be an interested party (PDF, 125.64 KB)

3 October 2017

Examination > Procedural Decisions Published: 24/11/2017

Recording of Issue Specific Hearing on the draft DCO (PDF, 31.39 KB)

23 November 2017

Examination > Issue Specific Hearing on draft DCO Published: 24/11/2017

Recording of Issue Specific Hearing on Environmental Matters – Part 3 (PDF, 31.39 KB)

22 November 2017

Examination > Issue Specific Hearing on Environmental Matters Published: 24/11/2017

Recording of Issue Specific Hearing on Environmental Matters – Part 2 (PDF, 31.39 KB)

22 November 2017

Examination > Issue Specific Hearing on Environmental Matters Published: 24/11/2017

Recording of Issue Specific Hearing on Environmental Matters – Part 1 (PDF, 31.39 KB)

22 November 2017

Examination > Issue Specific Hearing on Environmental Matters Published: 24/11/2017

Recording of Compulsory Acquisition Hearing (PDF, 31.39 KB)

23 November 2017

Examination > Compulsory acquisition hearing (if requested) Published: 24/11/2017

Action Points from Issue Specific Hearing on Environmental Matters (PDF, 51.64 KB)

22 November 2017

Examination > Issue Specific Hearing on Environmental Matters Published: 24/11/2017

Eggborough Power Limited (PDF, 5.03 MB)

Accompanied Site Inspection Route

Examination > Accompanied Site Inspection Published: 15/11/2017

Agenda for Issue Specific Hearings and Compulsory Acquisition Hearing (PDF, 49.95 KB)

Hearings on 22 and 23 November 2017

Examination > Hearing Agendas Published: 15/11/2017

Accompanied Site Inspection Itinerary (PDF, 50.87 KB)

21 November 2017

Examination > Accompanied Site Inspection Published: 15/11/2017

Hensall Parish Council (PDF, 16.64 KB)

Deadline 2 Submission

Examination > Deadline 2 Published: 13/11/2017

Eggborough Power Limited (PDF, 11.11 MB)

Deadline 2 Submission - 4.2 Land Plans (Key Plan and Sheets 1-4) (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 767.62 KB)

Deadline 2 Submission - 9.1 Appendix 3

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 8.67 MB)

Deadline 2 Submission - 9.1 Appendix 14 Part 1 of 2

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 262.53 KB)

Deadline 2 Submission - 7.11 Draft Statement of Common Ground with the Yorkshire Wildlife Trust (Rev. 1.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 505.39 KB)

Deadline 2 Submission - 7.1 Draft Statement of Common Ground with North Yorkshire County Council and Selby District Council (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 255.61 KB)

Deadline 2 Submission - 5.4 Other Consents and Licences (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 85.94 KB)

Deadline 2 Submission - 9.1 Appendix 8

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 358.45 KB)

Deadline 2 Submission - 4.14 Deemed Marine Licence Coordinates Plan (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 249.90 KB)

Deadline 2 Submission - 9.1 Appendix 13

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 206.01 KB)

Deadline 2 Submission - 9.1 Appendix 4

Examination > Deadline 2 Published: 02/11/2017

Environment Agency (PDF, 302.17 KB)

Deadline 2 Submission - Written Representation and Response to ExA's Written Questions

Examination > Deadline 2 Published: 02/11/2017

Yorkshire Wildlife Trust (PDF, 536.57 KB)

Deadline 2 Submission - Response to ExA's Written Questions

Examination > Deadline 2 Published: 02/11/2017

The Marine Management Organisation (MMO) (PDF, 343.81 KB)

Deadline 2 Submission

Examination > Deadline 2 Published: 02/11/2017

North Yorkshire County Council and Selby District Council (PDF, 44.21 KB)

Deadline 2 Submission - Joint Written Representation

Examination > Deadline 2 Published: 02/11/2017

North Yorkshire County Council and Selby District Council (PDF, 44.21 KB)

Deadline 2 Submission - Cover letter

Examination > Deadline 2 Published: 02/11/2017

North Yorkshire County Council and Selby District Council (PDF, 376.02 KB)

Deadline 2 Submission - Joint Response to ExA's Written Questions

Examination > Deadline 2 Published: 02/11/2017

North Yorkshire County Council and Selby District Council (PDF, 521.35 KB)

Deadline 2 Submission - Joint Local Impact Report

Examination > Deadline 2 Published: 02/11/2017

National Grid Plc (PDF, 25.80 KB)

Deadline 2 Submission - Written Representation

Examination > Deadline 2 Published: 02/11/2017

National Grid Plc (PDF, 25.80 KB)

Deadline 2 Submission - Response to ExA's Written Questions

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 192.68 KB)

Deadline 2 Submission - 9.1 Appendix 1

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 83.75 KB)

Deadline 2 Submission - Covering Email

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 4.93 MB)

Deadline 2 Submission - 9.1 Appendix 2

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 271.79 KB)

Deadline 2 Submission - 9.1 Appendix 10

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 217.49 KB)

Deadline 2 Submission - 2.5 Explanatory Note on Changes to Draft DCO (Rev. 1.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 874.23 KB)

Deadline 2 Submission - 2.4 – Draft DCO – Comparison to Submission Version (May 2017) (Rev. 1.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 136.34 KB)

Deadline 2 Submission - 9.1 Appendix 9

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 8.67 MB)

Deadline 2 Submission - 9.1 Appendix 14 Part 2 of 2

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 1.37 MB)

Deadline 2 Submission - 9.2 Comments on Relevant Representations, including Appendix 1

Examination > Deadline 2 Published: 02/11/2017

Canal and River Trust (PDF, 666.75 KB)

Deadline 2 Submission - Written Representation and Response to ExA's Written Questions

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 643.48 KB)

Deadline 2 Submission - 9.1 Appendix 7

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 1.08 MB)

Deadline 2 Submission - 9.1 Applicant’s Responses to the Examining Authority’s First Written Questions

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 202.44 KB)

Deadline 2 Submission - 9.1 Appendix 5

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 2.00 MB)

Deadline 2 Submission - 4.3 Crown Land Plan (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 912.17 KB)

Deadline 2 Submission - 9.1 Appendix 12

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 33.42 KB)

Deadline 2 Submission - 3.1 Book of Reference (Parts 1-5) (Track Change Version) (Rev. 3.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 252.95 KB)

Deadline 2 Submission - 1.2 Application Guide (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 432.53 KB)

Deadline 2 Submission - 7.5 Statement of Common Ground with The Coal Authority (Rev. 3.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 1.57 MB)

Deadline 2 Submission - 2.1 Updated Draft DCO (Rev. 2.0)

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 1.90 MB)

Deadline 2 Submission - 9.1 Appendix 11

Examination > Deadline 2 Published: 02/11/2017

Eggborough Power Limited (PDF, 179.10 KB)

Deadline 2 Submission - 9.1 Appendix 6

Examination > Deadline 2 Published: 02/11/2017

Notification of Hearing and Accompanied Site Inspection for November 2017 (PDF, 161.77 KB)

Examination > Procedural Decisions Published: 24/10/2017

North Yorkshire County Council and Selby District Council (PDF, 185.91 KB)

Response to letter of 11 October received from the Applicant. Late Submission for Deadline 1 accepted at the discretion of the Examining Authority

Examination > Deadline 1 Published: 16/10/2017

Eggborough Power Limited (PDF, 1.09 MB)

7.10 Statement of Common Ground between Eggborough Power Limited and the Marine Management Organisation (MMO) (Revision 2.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 252.35 KB)

7.9 Statement of Common Ground between Eggborough Power Limited and National Grid Gas PLC (NGG) and National Grid Electricity Transmission Plc (NGET) (Revision 2.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 483.22 KB)

7.4 Statement of Common Ground between Eggborough Power Limited and Historic England (Revision 4.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 112.06 KB)

Covering Letter for Deadline 1 Submissions

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 441.60 KB)

7.3 Statement of Common Ground between Eggborough Power Limited and Environment Agency (Revision 2.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 418.11 KB)

7.5 Statement of Common Ground between Eggborough Power Limited and The Coal Authority (Revision 3.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 582.75 KB)

7.8 Statement of Common Ground between Eggborough Power Limited and The Civil Aviation Authority (Revision 2.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 337.35 KB)

7.6 Statement of Common Ground between Eggborough Power Limited and Canal and River Trust (Revision 2.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 310.20 KB)

7.7 Statement of Common Ground between Eggborough Power Limited and Natural England (Revision 1.0)

Examination > Deadline 1 Published: 12/10/2017

Eggborough Power Limited (PDF, 2.70 MB)

7.2 Statement of Common Ground between Eggborough Power Limited and Highways England (Revision 3.0 )

Examination > Deadline 1 Published: 12/10/2017

Hensall Parish Council (PDF, 223.81 KB)

Notification of wish to be considered as an Interested Party

Examination > Deadline 1 Published: 12/10/2017

Martineau on behalf of National Grid Plc (PDF, 1.30 MB)

Response to Rule 8 letter

Examination > Deadline 1 Published: 12/10/2017

The Marine Management Organisation (MMO) (PDF, 195.73 KB)

Submission for Deadline 1

Examination > Deadline 1 Published: 12/10/2017

Response to Mr R Tams to a request to be an interested party (PDF, 85.65 KB)

9 October 2017

Examination > Procedural Decisions Published: 09/10/2017

Written Questions (PDF, 267.47 KB)

Examination > Procedural Decisions Published: 04/10/2017

Rule 8 Letter (PDF, 166.20 KB)

Examination > Procedural Decisions Published: 04/10/2017

Recording of Preliminary Meeting (PDF, 31.39 KB)

Examination > Recording of Preliminary Meeting Published: 04/10/2017

Preliminary Meeting Note (PDF, 61.36 KB)

Examination > Preliminary Meeting Note Published: 04/10/2017

Note of Unaccompanied Site Inspection – 26 September 2017 (PDF, 60.35 KB)

Examination > Unaccompanied Site Inspection Published: 04/10/2017

Examination Library (PDF, 469.49 KB)

Examination > Examination Library Published: 03/10/2017

Northern Gas Networks (PDF, 1.52 MB)

Additional Submission - Accepted at the discretion of the Examining Authority

Examination > Additional Submissions Published: 28/09/2017

Joint Nature Conservation Committee (PDF, 356.25 KB)

Additional Submission - Accepted at the discretion of the Examining Authority

Examination > Additional Submissions Published: 28/09/2017

Eggborough Power Limited (PDF, 33.42 KB)

Additional Submission - 3.1 Updated Book of Reference version 2. Accepted at the discretion of the Examining Authority

Examination > Additional Submissions Published: 28/09/2017

Eggborough Power Limited (PDF, 335.37 KB)

Additional Submission - Comments on draft Examination Timetable accepted at the discretion of the Examining Authority

Examination > Additional Submissions Published: 28/09/2017

Rule 6 Letter (PDF, 167.34 KB)

Pre Examination > Procedural Decisions Published: 30/08/2017

Dalton Warner Davis (PDF, 189.56 KB)

Certificate of Compliance with Section 59 of The Planning Act 2008

Pre Examination > Certificate of s59 notification (59) Published: 18/08/2017

Dalton Warner Davis (PDF, 230.26 KB)

Applicant’s response to post-Acceptance s51 advice dated 27 June 2017

Acceptance > Other Documents Published: 18/08/2017

Dalton Warner Davis (PDF, 195.12 KB)

Certificate of Compliance with Section 56 of The Planning Act 2008

Pre Examination > s56 notification (s56) Published: 18/08/2017

Dalton Warner Davis (PDF, 248.23 KB)

Certificates of compliance cover letter

Pre Examination > s56 notification (s56) Published: 18/08/2017

Dalton Warner Davis (PDF, 33.21 KB)

Certificate of Compliance with Regulation 13

Pre Examination > s56 notification (s56) Published: 18/08/2017

Notice of the Appointment of the Examining Authority (PDF, 56.41 KB)

Pre Examination > Procedural Decisions

Pre Examination > Procedural Decisions Published: 11/08/2017

Wakefield Metropolitan District Council (PDF, 181.20 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Stockton Borough Council (PDF, 38.85 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Redcar and Cleveland Borough Council (PDF, 40.21 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

North Yorkshire County Council and Selby District Council (PDF, 87.46 KB)

Joint Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

North York Moors National Park Authority (PDF, 116.41 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Leeds City Council (PDF, 151.23 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Harrogate Borough Council (PDF, 40.41 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

East Riding of Yorkshire Council (PDF, 13.70 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Durham County Council (PDF, 69.61 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Doncaster Metropolitan Borough Council (PDF, 116.98 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Cumbria County Council (PDF, 36.32 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

City of Bradford Metropolitan District Council (PDF, 153.34 KB)

Adequacy of Consultation Representation

Acceptance > Adequacy of Consultation Published: 28/06/2017

Section 55 Acceptance of Application Checklist (PDF, 203.95 KB)

Acceptance > Procedural Decisions Published: 27/06/2017

Section 51 advice following issue of acceptance decision (PDF, 83.08 KB)

Acceptance > Other Documents Published: 27/06/2017

Notification of Decision to Accept Application (PDF, 115.34 KB)

Acceptance > Acceptance letter Published: 27/06/2017

6.3.26 Figure 16.2 – Landscape Characterisation – Final – May 2017 (PDF, 2.08 MB)

Figure 16.2 - Landscape Characterisation

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.8 – Appendix 10A – Legislation and Planning Policy – Final – May 2017 (PDF, 435.28 KB)

Appendix 10A - Legislation and Planning Policy

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.28 Figure 16.4 – Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present – Final – May 2017 (PDF, 2.70 MB)

Figure 16.4 - Proposed 90 m Stack Zone of Theoretical Visibility with Existing Power Station Present

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.1 – ES Chapter 1 – Final – May 2017 (PDF, 359.64 KB)

Chapter 1 - Introduction

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.10 Figure 5.2 – Gas Connection Open Cut Construction Typical Cross Section – Final – May 2017 (PDF, 156.40 KB)

Figure 5.2 - Gas Connection Open Cut Construction Typical Cross Section

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.13 Figure 6.1 – Initial CCGT Site Options – Final – May 2017 (PDF, 1.07 MB)

Figure 6.1 - Initial CCGT Site Options

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.16 Figure 8.2 – Operational Process Contribution to Long-Term NO2 Concentration – Final – May 2017 (PDF, 3.28 MB)

Figure 8.2 - Operational Process Contribution to Long-Term NO2 Concentration

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.9 – Appendix 10B – Ecological Impact Assessment Methodology – Final – May 2017 (PDF, 438.78 KB)

Appendix 10B - Ecological Impact Assessment Methodology

Developer's Application > Environmental Statement Published: 05/06/2017

4.14 – Indicative Deemed Marine Licence Coordinates – Final – May 2017 (PDF, 97.85 KB)

Indicative Deemed Marine License Coordinates for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.2 – Land Plans (Key Plan and Sheets 1 – 4) – Final – May 2017 (PDF, 13.46 MB)

Land Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.5 – Access and Rights of Way Plans (Key Plan and Sheets 1 – 4) – Final – May 2017 (PDF, 9.43 MB)

Access and Rights of Way Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.9 – Indicative Groundwater and Towns Water Supply Connections Works Plan – Final – May 2017 (PDF, 944.51 KB)

Indicative Raw and Towns Water Supply Connections Works Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.3 – Crown Land and Special Category Land Plan – Final – May 2017 (PDF, 2.19 MB)

Crown Land for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.4.5 – Appendix 8B – Plume Visibility – Final – May 2017 (PDF, 353.19 KB)

Appendix 8B - Plume Visibility

Developer's Application > Environmental Statement Published: 05/06/2017

5.3 – Gas Connection Statement – Final – May 2017 (PDF, 1.12 MB)

Gas Connection and Pipeline Statement for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

4.11 – Indicative Above Ground Installation Plans (Sheets 1 and 2) – Final – May 2017 (PDF, 282.06 KB)

Indicative Above Ground Installation Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.1 – Location Plan – Final – May 2017 (PDF, 1.91 MB)

Location Plan for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

2.1 – Draft Development Consent Order – Final – May 2017 (PDF, 1.03 MB)

Draft Development Consent Order for the Eggborough CCGT project

Developer's Application > Draft Development Consent Orders Published: 05/06/2017

2.2 – Explanatory Memorandum – Final – May 2017 (PDF, 546.78 KB)

Explanatory Memorandum for the Eggborough CCGT project

Developer's Application > Draft Development Consent Orders Published: 05/06/2017

6.2.6 – ES Chapter 6 – Final – May 2017 (PDF, 416.69 KB)

Chapter 6 - Need, Alternatives and Design Evolution

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.2 Figure 3.1 – The Site Boundary Plan – Final – May 2017 (PDF, 1.22 MB)

Figure 3.1 - The Site Bounary Plan for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

1.4 – Notices for Statutory Publicity – Final – May 2017 (PDF, 13.12 MB)

Notices for Statutory Publicity for the Eggborough CCGT project

Developer's Application > Application Form Published: 05/06/2017

6.2.16 – ES Chapter 16 – Final – May 2017 (PDF, 955.75 KB)

Chapter 16 - Landscape and Visual Amenity

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.13 – ES Chapter 13 – Final – May 2017 (PDF, 843.34 KB)

Chapter 13 - Cultural Heritage

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.9 – ES Chapter 9 – Final – May 2017 (PDF, 1.13 MB)

Developer's Application > Environmental Statement

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.8 – ES Chapter 8 – Final – May 2017 (PDF, 784.99 KB)

Chapter 8 - Air Quality

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.10 – ES Chapter 10 – Final – May 2017 (PDF, 705.48 KB)

Chapter 10 - Ecology

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.29 Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present – Final – May 2017 (PDF, 2.73 MB)

Figure 16.5 - Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present

Developer's Application > Environmental Statement Published: 05/06/2017

1.2 – Application Guide – Final – May 2017 (PDF, 509.34 KB)

Application Guide for the Eggborough CCGT project

Developer's Application > Application Form Published: 05/06/2017

6.2.7 – ES Chapter 7 – Final – May 2017 (PDF, 467.96 KB)

Chapter 7 - Legislative Context and Planning Policy Framework

Developer's Application > Environmental Statement Published: 05/06/2017

4.12 – Indicative Drainage Plan – Final – May 2017 (PDF, 408.93 KB)

Indicative Drainge Plan for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.4.6 – Appendix 9A – Construction Noise Assessment Methodology – Final – May 2017 (PDF, 408.93 KB)

Appendix 9A - Construction Noise Assessment Methodology

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.3 – Appendix 5A – Construction Environmental Management Plan (CEMP) – Final – May 2017 (PDF, 628.39 KB)

Appendix 5A - Construction Environment Management Plan (CEMP)

Developer's Application > Environmental Statement Published: 05/06/2017

5.1 – Consultation Report – Final – May 2017 (PDF, 88.81 MB)

5.1 - Consultation Report

Developer's Application > Reports Published: 05/06/2017

5.4 – Other Consents and Licences – Final – May 2017 (PDF, 385.28 KB)

Other Consents and Licenses for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

6.4.17 – Appendix 12A – Phase I Geotechnical & Geo-Environmental Site Assessment – Final – May 2017 (PDF, 14.20 MB)

Appendix 12A - Phase 1 Geotechnical & Geo-Environmental Site Assessment

Developer's Application > Environmental Statement Published: 05/06/2017

7.12 Statement of Common Ground – Sport England – Final – May 17 (PDF, 504.33 KB)

7.12 Statement of Common Ground - Sport England - Final - May 17

Developer's Application > Other Documents Published: 05/06/2017

5.2 – Grid Connection Statement – Final – May 2017 (PDF, 361.02 KB)

5.2 - Grid Connection Statement

Developer's Application > Reports Published: 05/06/2017

6.3.11 Figure 5.3 – Indicative cofferdam arrangement (cooling water abstraction point) – Final – May 2017 (PDF, 120.80 KB)

Figure 5.3 - Indicative Cofferdam Arrangement (cooling water abstraction point)

Developer's Application > Environmental Statement Published: 05/06/2017

3.1 – Book of Reference – Final – May 2017 (PDF, 33.42 KB)

Book of Reference for the Eggborough CCGT project

Developer's Application > Compulsory Acquisition Information Published: 05/06/2017

3.3 – Funding Statement – Final – May 2017 (PDF, 11.31 MB)

Funding Statement

Developer's Application > Compulsory Acquisition Information Published: 05/06/2017

3.2 – Statement of Reasons – Final – May 2017 (PDF, 879.01 KB)

Statement of Reasons for the Eggborough CCGT project

Developer's Application > Compulsory Acquisition Information Published: 05/06/2017

6.4.18 – Appendix 12B – Groundsure Report – Part 1 (PDF, 39.33 MB)

Appendix 12B - Groundsure Report - Part 1

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.32 Figure 16.8 – 16.36 – Photo Viewpoints – Final – May 2017 (PDF, 29.07 MB)

Figure 16.8-16.36 - Photo Viewpoints

Developer's Application > Environmental Statement Published: 05/06/2017

4.6 – Indicative Generating Station Plan (Key Plan and Sheets 1 – 6) – Final – May 2017 (PDF, 4.22 MB)

Indicative Generating Station Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

5.9 – Statutory Nuisance Statement – Final – May 2017 (PDF, 544.84 KB)

5.9 - Statutory Nuisance Statement

Developer's Application > Reports Published: 05/06/2017

5.7 – Combined Heat and Power Assessment – Final – May 2017 (PDF, 1.01 MB)

5.7 - Combined Heat and Power Assessment for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

6.1 – Environmental Statement Non-Technical Summary – Final – May 2017 (PDF, 14.34 MB)

Environmental Statement Non-Technical Summary for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.30 Figure 16.6 – Above Ground Installation Zone of Theoretical Visibility – Final – May 2017 (PDF, 1.60 MB)

Figure 16.6 - Above Ground Installation Zone of Theoretical Visibility

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.27 – Appendix 21A – Commitments Register – Final – May 2017 (PDF, 551.45 KB)

Appendix 21A - Commitments Register

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.15 Figure 8.1 – Air Quality Study Area and Receptor Locations – Final – May 2017 (PDF, 6.19 MB)

Figure 8.1 - Air Quality Study Area and Receptor Locations

Developer's Application > Environmental Statement Published: 05/06/2017

1.1 – Application Cover Letter – Final – May 2017 (PDF, 379.32 KB)

Developer's Application > Application Form Published: 05/06/2017

6.3.1 Figure 1.1 – Site Location Plan – Final – May 2017 (PDF, 2.17 MB)

Figure 1.1 - Site Location Plan for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

5.5 – Planning Statement – Final – May 2017 (PDF, 1.09 MB)

Planning Statement for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

5.10 – Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan) – Final – May 2017 (PDF, 11.39 MB)

5.10 - Indicative Landscaping and Biodiversity Strategy (including Arboricultural Assessment and Landscape and Biodiversity Plan)

Developer's Application > Reports Published: 05/06/2017

6.4.12 – Appendix 10E – Great Crested Newt Survey Report – Final – May 2017 (PDF, 2.58 MB)

Appendix 10E - Great Crested Newt Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

5.6 – Design and Access Statement – Final – May 2017 (PDF, 3.94 MB)

Design and Access Statement for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

6.2.17 – ES Chapter 17 – Final – May 2017 (PDF, 535.50 KB)

Chapter 17 - Waste Management

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.7 – Appendix 9B – Operational Noise Information – Final – May 2017 (PDF, 400.08 KB)

Appendix 9B - Operational Noise Information

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.24 Figure 15.1 – Agricultural Land Classification Soil Survey Map – Final – May 2017 (PDF, 605.82 KB)

Figure 15.1 – Agricultural Land Classification Soil Survey Map

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.27 Figure 16.3 – Public Rights of Way – Final – May 2017 (PDF, 1.47 MB)

Figure 16.3 - Public Rights of Way

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.24 Figure 15.1 – Agricultural Land Classification Soil Survey Map – Final – May 2017 (PDF, 605.82 KB)

Figure 15.1 – Agricultural Land Classification Soil Survey Map

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.27 Figure 16.3 – Public Rights of Way – Final – May 2017 (PDF, 1.47 MB)

Figure 16.3 - Public Rights of Way

Developer's Application > Environmental Statement Published: 05/06/2017

4.4 – Works Plans (Key Plan and Sheets 1 – 9) – Final – May 2017 (PDF, 8.51 MB)

Works Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.4.23 – Appendix 16A – Landscape and Visual Impact Assessment Methodology – Final – May 2017 (PDF, 633.80 KB)

Appendix 16A - Landscape and Visual Impact Assessment Methodology

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.18 Figure 8.4 – Abnormal Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017 (PDF, 3.13 MB)

Figure 8.4 - Abnormal Operational Process Contribution To Short-Term NO2 Concentration

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.19 – ES Chapter 19 – Final – May 2017 (PDF, 544.44 KB)

Chapter 19 - Human Health

Developer's Application > Environmental Statement Published: 05/06/2017

1.3 – Application Form – Final – May 2017 (PDF, 335.83 KB)

Application Form for the Eggborough CCGT project

Developer's Application > Application Form Published: 05/06/2017

6.3.34 Figure 16.55 – Landscape and Biodiversity Plan – Final – May 2017 (PDF, 1.25 MB)

Figure 16.55 - Landscape and Biodiversity Plan

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.31 Figure 16.7 – Viewpoint Locations – Final – May 2017 (PDF, 4.71 MB)

Figure 16.7 - Viewpoint Locations

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.23 Figure 13.2 – Location of Non-Designated Heritage Assets within the 1 km Study Area – Final – May 2017 (PDF, 2.04 MB)

Figure 13.2 - Location of Non-Designated Heritage Assets within the 1 km Study Area

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.20 Figure 11.1 – Watercourses within the Study Area – Final – May 2017 (PDF, 2.04 MB)

Figure 11.1 - Watercourses within the Study Area

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.22 Figure 13.1 – Location of Designated Heritage Assets within the 5 km Study Area – Final – May 2017 (PDF, 1.89 MB)

Figure 13.1 - Location of Designated Heritage Assets within the 5 km Study Area

Developer's Application > Environmental Statement Published: 05/06/2017

2.3 – Draft DCO – Comparisons to Model Provisions version – Final – May 2017 (PDF, 1.15 MB)

Draft DCO - Comparison to Model Provisions Version document for the Eggborough CCGT project

Developer's Application > Draft Development Consent Orders Published: 05/06/2017

6.4.22 – Appendix 15A – Agricultural Land Classification Soil Survey – Final – May 2017 (PDF, 4.44 MB)

Appendix 15A - Agricultural Land Classification Soil Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.25 – Appendix 16C – Potential Viewpoints – Final – May 2017 (PDF, 413.18 KB)

Appendix 16C - Potential Viewpoints Locations

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.4 – ES Chapter 4 – Final – May 2017 (PDF, 606.37 KB)

Chapter 4 - The Proposed Development

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.24 – Appendix 16B – NYCC Consultation Summary – Final – May 2017 (PDF, 551.57 KB)

Appendix 16B - North Yorkshire County Council Consultation

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.3 – ES Chapter 3 – Final – May 2017 (PDF, 453.97 KB)

Chapter 3 - Description of the Site

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.21 Figure 12.1 Environmental database features – Final – May 2017 (PDF, 1.56 MB)

Figure 12.1 - Environmental database features

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.5 Figure 4.1b – Indicative Concept Layout (Multi Shaft Single Shaft) for the Proposed Development – Final – May 2017 (PDF, 465.55 KB)

Figure 4.1b - Indicative Concept Layout (Multi shaft + Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site.pdf

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.14 – ES Chapter 14 – Final – May 2017 (PDF, 613.17 KB)

Chapter 14 - Traffic and Transportation

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.19 Figure 9.1 – Baseline Noise Monitoring Locations and Sensitive Noise Receptors – Final – May 2017 (PDF, 1.38 MB)

Figure 9.1 - Baseline Noise Monitoring Locations and Noise Sensitive Receptors

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.5 – ES Chapter 5 – Final – May 2017 (PDF, 424.15 KB)

Chapter 5 - Construction Programme and Management

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.33 Figure 16.37 – 16.54 – Photomontages – Final – May 2017 (PDF, 50.54 MB)

Figure 16.37-16.54 - Photomontages

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.6 Figure 4.2 – Indicative Railway Arrangement – Final – May 2017 (PDF, 343.96 KB)

Figure 4.2 - Indicative Railway Arrangement

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.8 Figure 4.4 – Above Ground Installation – Final – May 2017 (PDF, 90.42 KB)

Figure 4.4 - Above Ground Installation

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.35 Figure 20.1 – Other Developments Considered for Cumulative Impact Assessment – Final – May 2017 (PDF, 2.10 MB)

Figure 20.1 - Other Developments Considered for Cumulative Impact Assessment

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.9 Figure 5.1 – Gas Connection Pipeline construction methods – Final – May 2017 (PDF, 777.58 KB)

Figure 5.1 - Gas Connection Pipeline Construction Methods

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.21 – Appendix 14A – Transport Assessment – Final – May 2017 (PDF, 38.10 MB)

Appendix 14A - Transport Assessment

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.14 – Appendix 10G – Fish Survey Report – Final – May 2017 (PDF, 1.84 MB)

Appendix 10G - Fish Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.11 – Appendix 10D – Mammal Survey Report – Final – May 2017 (PDF, 13.64 MB)

Appendix 10D - Mammal Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.19 – Appendix 13A – Gazetteer of Cultural Heritage Assets – Final – May 2017 (PDF, 433.47 KB)

Appendix 13A - Gazetteer of Cultural Heritage Assets

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.2 – Appendix 1B – Environmental Impact Assessment Scoping Opinion – Final – May 2017 (PDF, 5.81 MB)

Appendix 1B - Environmental Impact Assessment Scoping Opinion

Developer's Application > Environmental Statement Published: 05/06/2017

6.2 – Environmental Statement – Volume 1 (Main Report) – Final – May 2017 (PDF, 570.04 KB)

Environmental Statement - Volume 1 (Main Report) for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.11 – ES Chapter 11 – Final – May 2017 (PDF, 817.82 KB)

Chapter 11 - Water Resources, Flood Risk and Drainage

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.10 – Appendix 10C – Preliminary Ecological Appraisal – Final – May 2017 (PDF, 18.60 MB)

Appendix 10C - Preliminary Ecological Appraisal

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.21 – ES Chapter 21 – Final – May 2017 (PDF, 470.77 KB)

Chapter 21 - Summary of Significant Effects

Developer's Application > Environmental Statement Published: 05/06/2017

4.7 – Indicative Electrical Connection Works Plan – Final – May 2017 (PDF, 552.57 KB)

Indicative Electrical Connection Works Plan for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

4.10 – Indicative Gas Supply Pipelines Connection Works Plans – Final – May 2017 (Key Plan and Sheets 1 – 7) (PDF, 2.69 MB)

Indicative Gas Supply and Pipelines Connection Works Plans for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.4.15 – Appendix 10H – Habitats Regulations Assessment (HRA) Signposting – Final – May 2017 (PDF, 2.94 MB)

Appendix 10H - Habitats Regulations Assessment (HRA) Signposting - Final - May 2017

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.14 Figure 6.2 – Gas Connection Corridor Options – Final – May 2017 (PDF, 1.54 MB)

Figure 6.2 - Gas Connection Corridor Options

Developer's Application > Environmental Statement Published: 05/06/2017

6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017 (PDF, 518.74 KB)

Environmental Statement - Volume 2 (Figures) for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017 (PDF, 1.59 MB)

Figure 3.2 - Parts of the Site (Plan) for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017 (PDF, 518.74 KB)

Environmental Statement - Volume 2 (Figures) for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017 (PDF, 1.59 MB)

Figure 3.2 - Parts of the Site (Plan) for the Eggborough CCGT project

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.25 Figure 16.1 – Potential Viewpoint Locations – Final – May 2017 (PDF, 4.74 MB)

Figure 16.1 - Potential Viewpoint Locations

Developer's Application > Environmental Statement Published: 05/06/2017

4.8 – Indicative Cooling Water Connection Works Plans (Key Plan and Sheets 1 – 3) – Final – May 2017 (PDF, 2.97 MB)

Indicative Cooling Water Connection for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.4 ES – Volume 3 (Appendices) – Final – May 2017 (PDF, 528.50 KB)

ES - Volume 3 (Appendices)

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.7 Figure 4.3 – Gas Connection – Final – May 2017 (PDF, 766.63 KB)

Figure 4.3 - Gas Connection

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.4 Figure 4.1a – Indicative Concept Layout (Single Shaft) for the Proposed Development – Final – May 2017 (PDF, 464.81 KB)

Figure 4.1a - Indicative Concept Layout (Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site

Developer's Application > Environmental Statement Published: 05/06/2017

4.13 – Indicative Landscaping and Biodiversity Plans (Key Plan and Sheets 1-5) – Final – May 2017 (PDF, 1.50 MB)

Indicative Landscaping and Biodiversity Plan for the Eggborough CCGT project

Developer's Application > Plans Published: 05/06/2017

6.3.12 Figure 5.4 – Indicative cofferdam arrangement (cooling water discharge point) – Final – May 2017 (PDF, 79.16 KB)

Figure 5.4 - Indicative cofferdam arrangement (cooling water discharge point)

Developer's Application > Environmental Statement Published: 05/06/2017

6.3.17 Figure 8.3 – Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017 (PDF, 3.12 MB)

Figure 8.3 - Operational Process Contribution to Short-Term NO2 Concentration

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.13 – Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report – Final – May 2017 (PDF, 3.45 MB)

Appendix 10F - River Corridor and Aquatic Macrophyte Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.16 – Appendix 11A – Flood Risk Assessment – Final – May 2017 (PDF, 27.30 MB)

Appendix 11A - Flood Risk Assessment

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.18 – Appendix 12B – Groundsure Report – Part 2 – Final – May 2017 (PDF, 45.25 MB)

Appendix 12B – Groundsure Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.20 – Appendix 13B Geophysical Survey Report – Final – May 2017 (PDF, 44.63 MB)

Appendix 13B - Geophysical Survey Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.15 – ES Chapter 15 – Final – May 2017 (PDF, 648.75 KB)

Chapter 15 - Land Use, Agriculture and Socio-economics

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.2 – ES Chapter 2 – Final – May 2017 (PDF, 458.51 KB)

Chapter 2 - Assessment Methodology

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.20 – ES Chapter 20 – Final – May 2017 (PDF, 692.94 KB)

Chapter 20 - Cumulative and Combined Effects

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.1 – Appendix 1A – Environmental Impact Assessment Scoping Report – Final – May 2017 (PDF, 14.26 MB)

Appendix 1A - Environmental Impact Assessment Scoping Report

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.26 – Appendix 18A – Carbon assessment – Final – May 2017 (PDF, 523.86 KB)

Appendix 18A - Carbon assessment

Developer's Application > Environmental Statement Published: 05/06/2017

6.4.4 – Appendix 8A – Air Quality – Final – May 2017 (PDF, 860.68 KB)

Appendix 8A - Air Quality Assessment

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.12 – ES Chapter 12 – Final – May 2017 (PDF, 672.64 KB)

Chapter 12 - Geology, Hydrogeology and Land Contamination

Developer's Application > Environmental Statement Published: 05/06/2017

6.2.18 – ES Chapter 18 – Final – May 2017 (PDF, 463.87 KB)

Chapter 18 - Sustainability and Climate Change

Developer's Application > Environmental Statement Published: 05/06/2017

5.8 – Carbon Capture Readiness (CCR) Statement – Final – May 2017 (PDF, 8.26 MB)

Carbon Capture and Storage (CCS) & Carbon Capture Readiness (CCR) Statement for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

5.11 – Indicative Lighting Strategy – Final – May 2017 (PDF, 1.78 MB)

Indicative Lighting Strategy for the Eggborough CCGT project

Developer's Application > Reports Published: 05/06/2017

Section 46 – Acknowledgment of receipt of information (PDF, 118.92 KB)

Pre Application > Other Documents Published: 12/01/2017

Dalton Warner Davis (PDF, 111.64 KB)

Section 46 - Covering letter

Pre Application > Other Documents Published: 12/01/2017

Scoping Opinion (PDF, 4.47 MB)

Scoping Opinion for the proposed Eggborough CCGT Project, adopted by the Secretary of State on 28 September 2016.

Pre Application > Scoping opinion (Rule 8 EIA Regs) Published: 28/09/2016

Late Scoping Consultation Responses (PDF, 1.36 MB)

Scoping consultation responses for the Eggborough CCGT project received after the 28 day consultation deadline. Published on 28 September 2016.

Pre Application > Scoping opinion (Rule 8 EIA Regs) Published: 28/09/2016

Scoping Report (Part 2 of 2) (PDF, 9.54 MB)

The Applicant’s Scoping Report for Eggborough CCGT project. Submitted to the Secretary of State on 18 August 2016. (Part 2 of 2)

Pre Application > Environmental Impact Assessment Published: 20/08/2016

Scoping Report (Part 1 of 2) (PDF, 5.57 MB)

The Applicant’s Scoping Report for Eggborough CCGT project. Submitted to the Secretary of State on 18 August 2016. (Part 1 of 2)

Pre Application > Environmental Impact Assessment Published: 19/08/2016

Recommendation Report (PDF, 2.45 MB)

Decision > Recommendation Report Published: 01/01/2000
Showing 1 to x of x entries (filtered from 342 total entries)