Appendix 10E – Great Crested Newt Survey Report
Read moreFigure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present
Read moreFigure 3.2 – Parts of the Site (Plan) for the Eggborough CCGT project
Read moreAppendix 10F – River Corridor and Aquatic Macrophyte Survey Report
Read moreFigure 1.1 – Site Location Plan for the Eggborough CCGT project
Read moreEnvironmental Statement – Volume 2 (Figures) for the Eggborough CCGT project
Read moreChapter 11 – Water Resources, Flood Risk and Drainage
Read more