6.2.17 – ES Chapter 17 – Final – May 2017

6.2.17 – ES Chapter 17 – Final – May 2017

Chapter 17 – Waste Management

Read more
6.2.7 – ES Chapter 7 – Final – May 2017

6.2.7 – ES Chapter 7 – Final – May 2017

Chapter 7 – Legislative Context and Planning Policy Framework

Read more
6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017

6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017

Environmental Statement – Volume 2 (Figures) for the Eggborough CCGT project

Read more
6.4.16 – Appendix 11A – Flood Risk Assessment – Final – May 2017

6.4.16 – Appendix 11A – Flood Risk Assessment – Final – May 2017

Appendix 11A – Flood Risk Assessment

Read more
6.3.5 Figure 4.1b – Indicative Concept Layout (Multi Shaft Single Shaft) for the Proposed Development – Final – May 2017

6.3.5 Figure 4.1b – Indicative Concept Layout (Multi Shaft Single Shaft) for the Proposed Development – Final – May 2017

Figure 4.1b – Indicative Concept Layout (Multi shaft + Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site.pdf

Read more
6.3.18 Figure 8.4 – Abnormal Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017

6.3.18 Figure 8.4 – Abnormal Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017

Figure 8.4 – Abnormal Operational Process Contribution To Short-Term NO2 Concentration

Read more
6.4.12 – Appendix 10E – Great Crested Newt Survey Report – Final – May 2017

6.4.12 – Appendix 10E – Great Crested Newt Survey Report – Final – May 2017

Appendix 10E – Great Crested Newt Survey Report

Read more
6.3.29 Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present – Final – May 2017

6.3.29 Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present – Final – May 2017

Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present

Read more
6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017

6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017

Figure 3.2 – Parts of the Site (Plan) for the Eggborough CCGT project

Read more
6.4.13 – Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report – Final – May 2017

6.4.13 – Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report – Final – May 2017

Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report

Read more