6.4.18 – Appendix 12B – Groundsure Report – Part 1

6.4.18 – Appendix 12B – Groundsure Report – Part 1

Appendix 12B – Groundsure Report – Part 1

Read more
6.4.6 – Appendix 9A – Construction Noise Assessment Methodology – Final – May 2017

6.4.6 – Appendix 9A – Construction Noise Assessment Methodology – Final – May 2017

Appendix 9A – Construction Noise Assessment Methodology

Read more
6.2.16 – ES Chapter 16 – Final – May 2017

6.2.16 – ES Chapter 16 – Final – May 2017

Chapter 16 – Landscape and Visual Amenity

Read more
6.3.17 Figure 8.3 – Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017

6.3.17 Figure 8.3 – Operational Process Contribution to Short-Term NO2 Concentration – Final – May 2017

Figure 8.3 – Operational Process Contribution to Short-Term NO2 Concentration

Read more
6.4.24 – Appendix 16B – NYCC Consultation Summary – Final – May 2017

6.4.24 – Appendix 16B – NYCC Consultation Summary – Final – May 2017

Appendix 16B – North Yorkshire County Council Consultation

Read more
6.4.11 – Appendix 10D – Mammal Survey Report – Final – May 2017

6.4.11 – Appendix 10D – Mammal Survey Report – Final – May 2017

Appendix 10D – Mammal Survey Report

Read more
6.3.11 Figure 5.3 – Indicative cofferdam arrangement (cooling water abstraction point) – Final – May 2017

6.3.11 Figure 5.3 – Indicative cofferdam arrangement (cooling water abstraction point) – Final – May 2017

Figure 5.3 – Indicative Cofferdam Arrangement (cooling water abstraction point)

Read more
6.4.5 – Appendix 8B – Plume Visibility – Final – May 2017

6.4.5 – Appendix 8B – Plume Visibility – Final – May 2017

Appendix 8B – Plume Visibility

Read more
6.3.2 Figure 3.1 – The Site Boundary Plan – Final – May 2017

6.3.2 Figure 3.1 – The Site Boundary Plan – Final – May 2017

Figure 3.1 – The Site Bounary Plan for the Eggborough CCGT project

Read more
6.4.4 – Appendix 8A – Air Quality – Final – May 2017

6.4.4 – Appendix 8A – Air Quality – Final – May 2017

Appendix 8A – Air Quality Assessment

Read more