6.4.12 – Appendix 10E – Great Crested Newt Survey Report – Final – May 2017

6.4.12 – Appendix 10E – Great Crested Newt Survey Report – Final – May 2017

Appendix 10E – Great Crested Newt Survey Report

Read more
6.3.29 Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present – Final – May 2017

6.3.29 Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present – Final – May 2017

Figure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present

Read more
6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017

6.3.3 Figure 3.2 – Parts of the Site – Final – May 2017

Figure 3.2 – Parts of the Site (Plan) for the Eggborough CCGT project

Read more
6.4.13 – Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report – Final – May 2017

6.4.13 – Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report – Final – May 2017

Appendix 10F – River Corridor and Aquatic Macrophyte Survey Report

Read more
6.2.14 – ES Chapter 14 – Final – May 2017

6.2.14 – ES Chapter 14 – Final – May 2017

Chapter 14 – Traffic and Transportation

Read more
6.3.1 Figure 1.1 – Site Location Plan – Final – May 2017

6.3.1 Figure 1.1 – Site Location Plan – Final – May 2017

Figure 1.1 – Site Location Plan for the Eggborough CCGT project

Read more
6.2.10 – ES Chapter 10 – Final – May 2017

6.2.10 – ES Chapter 10 – Final – May 2017

Chapter 10 – Ecology

Read more
6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017

6.3 – Environmental Statement – Volume 2 (Figures) – Final – May 2017

Environmental Statement – Volume 2 (Figures) for the Eggborough CCGT project

Read more
6.2.21 – ES Chapter 21 – Final – May 2017

6.2.21 – ES Chapter 21 – Final – May 2017

Chapter 21 – Summary of Significant Effects

Read more
6.2.11 – ES Chapter 11 – Final – May 2017

6.2.11 – ES Chapter 11 – Final – May 2017

Chapter 11 – Water Resources, Flood Risk and Drainage

Read more