Chapter 7 – Legislative Context and Planning Policy Framework
Read moreEnvironmental Statement – Volume 2 (Figures) for the Eggborough CCGT project
Read moreAppendix 11A – Flood Risk Assessment
Read moreFigure 4.1b – Indicative Concept Layout (Multi shaft + Single Shaft) for the Proposed Development with the Existing Coal-Fired Power Station Site.pdf
Read moreFigure 8.4 – Abnormal Operational Process Contribution To Short-Term NO2 Concentration
Read moreAppendix 10E – Great Crested Newt Survey Report
Read moreFigure 16.5 – Proposed 90 m Stack Zone of Theoretical Visibility without Existing Power Station Present
Read moreFigure 3.2 – Parts of the Site (Plan) for the Eggborough CCGT project
Read moreAppendix 10F – River Corridor and Aquatic Macrophyte Survey Report
Read more